Project Management on Building Automation System Projects

Share This Post

Project management on building automation system projects is sometimes viewed as simply making sure tasks are checked off a list as a project moves along. But it should be more than that. It should be a strategy for how you get work done, or set of tools that you use to plan and apply to your projects. The project manager should be thought of as the maestro or composer of your projects. Every team member has notable talent and skill like the musicians, whereas the project manager can see the beginning and the path to the end like a conductor can through the musical composition, and they help guide everyone through it while keeping everything in harmony. The project manager’s composition is the project plan.

Build an understanding of scheduling theory, which involves resource restrictions (how many people you have to do the work), and precedence constraints (the logic of the order the work can occur in). Project scheduling software like Microsoft Project and Oracle Primavera are designed specifically for this. You don’t need to become an expert in these tools to effectively use them for BAS projects, but you should get to know at least one of them and learn to use it. Manually calculating (even with a spreadsheet) resource loading and precedence logic, especially considering that it’s constantly changing throughout a project would not be worth the effort when there are already tools developed specifically for this.

Some examples of milestones you need to be concerned with are:

  • Structural milestones that are related to your ability to install electrical raceway, wiring, hang panels, etc.
  • When various pieces of equipment (AHU’s, central heating/cooling equipment, terminal units) will be set and accessible to your team,
  • When hydronic piping and control valves will be installed for each building or geographical area as it makes sense for your project,
  • Electrical power availability dates for all relevant electrical panels and mechanical equipment, by building or geographical area,
  • Mechanical start-up dates for all equipment, by building or geographical area
  • Network availability, by building or geographical area

You will need to go through this process on a project or two to understand the level of detail and granularity you need to have with the milestones. Remember that these dates will be in constant flux throughout the project and you will need to be updating them in your project schedule to assess the impact of their change. Keep it as simple and manageable as possible while still providing the right amount of information.

Once you understand these things about your project, you can figure out when each of the milestones needs to be finished for you to complete your work in the amount of time and with the number of resources you had budgeted. This is critical, because it’s horribly inefficient to have more people working on a task that it would normally take. For example, if something usually takes two people 10 hours to complete, doubling the resources to 4 almost never means it will take 5 hours to complete (it could be more like 6 or 7 hours). This inefficiency is coming right out of your profit, and you are unlikely to get any sympathy from your customer or others in the contracting chain if you are experiencing this pain, because ultimately, it may be your fault for not identifying it and building a proper plan.

Also consider providing training for your project leaders in the following areas: lean construction management and just-in-time delivery, financial management concepts, formal project management concepts and techniques from organizations like the Project Management Institute, contract law, and perhaps most importantly, leadership. Having a project manager who can effectively lead and motivate your project teams, rather than simply dole out work tasks, is invaluable.

Stop by www.BlueRithm.com and see how our software can help your projects and business be more profitable.

More To Explore

How Big Things Get Done with Commissioning - Bluerithm
Commissioning

How Big Things Get Done with Commissioning

In construction, especially when dealing with large-scale projects or “megaprojects,” as detailed in the book “How Big Things Get Done” by Bent Flyvbjerg and Dan Gardner, the concept of commissioning emerges as a pivotal element that contributes to the success

Building Technology

Autodesk Revit + Bluerithm Integration

Announcing the New Bluerithm Revit Add-In We’re pleased to introduce the Bluerithm Revit Add-In, a significant enhancement to our platform that facilitates the synchronization of assets and their data in Revit models with Bluerithm. This add-in is designed to improve

2023-06-18_19h25_51

Customizable site visit report templates with options to track as standalone activities, or to incorporate into the issues log.

2023-06-18_19h26_16

Customizable design review templates with options to track as standalone activities, or to incorporate into the issues log.

2023-06-18_19h26_42

Customizable meeting minute templates.

TAB templates for custom forms with formulas that you can create and edit. 

Functional and integrated systems tests / level 4 and 5 forms for commercial commissioning. 

Virtually unlimited formats to support your unique needs. 

Pre-functional / level 2 and 3 checklists for commercial commissioning, installation and startup tracking.

Bluerithm has LEED process checklists to ensure you’re on track with your LEED certification requirements, as well as checklist and test forms so you can meet Fundamental and Enhanced LEED certification requirements.

Bluerithm has extensive templates ready to use and customize for a variety of commercial commissioning needs. 

Bluerithm has comprehensive punch list and issue log features to support thorough recording, tracking, and control workflows. New items and responses can be easily added on mobile devices in the field, even when offline. 

Issues are customizable on a project by project basis with custom fields.